Staff Editorials
A need for transparency throughout construction
Between the expansion of Umrath House, the ongoing renovations to Olin Library and the frequent Overpass closures, it’s safe to say that students at Washington University are used to construction.
But the East End expansion poses different and deeper challenges than other recent projects—and most current students will graduate before they can reap the project’s myriad of benefits.
The Student Life editorial board commends the University for turning the East End, once an area mostly forgotten by students not in the graduate Engineering or Sam Fox schools, into a booming hotspot with a bustling student center, shiny new academic buildings and an improved art museum. We believe that future students will be drawn to Wash. U. by these additional facilities, and we are proud to attend a University that makes strides toward a better campus—and future—for its students.
But these upgrades should not cause agony for students attending the University through May 2019, before the project reaches completion, who at the very least will have to deal with excessive noise and a lousy view until phase 1 of the project is finished.
The University nearly closed Etta’s Cafe—the only food option open on the east side of Danforth campus past lunchtime—without providing students sufficient warning. Students face limited parking options and are now unable to bring cars on campus as sophomores because of these renovations. Walk times from off-campus digs are also severely impacted by the construction.
Students are making many concessions to their Wash. U. lives as a result of the construction, and the editorial board calls upon the University to prioritize transparency throughout the process.
The University has already taken initial steps to provide students with information regarding the East End construction: A specific section of the Campus Next website is devoted to the project, and students can subscribe for email updates.
But the page is not enough—it isn’t well-publicized and has, thus far, been updated infrequently. We suggest that more can be done to alert students of the inconveniences created by East End construction, whether that be by sending out all-school emails or papering campus with flyers alerting them to alternative routes and procedures.
Many students are returning to campus—or coming for the first time— without knowing exactly how their lives will be affected by this project, and that some may be surprised to find that construction impedes upon the lives they’ve built at this University. We urge the University to work with students, especially those in the graduate Engineering and Sam Fox schools, and to recognize and resolve student concern by providing additional resources where necessary.
The East End expansion will be highly beneficial to Wash. U. students for years to come—but that area of campus needs to be a positive living and learning environment for today’s students, too.